Vasilkovsky Selects Wenco for Vasilkovsky Gold
May 2010 - Vancouver, BC. Vasilkovsky has chosen to install the Wenco Fleet Management System on the entire fleet at Vasilkovksy Gold mine, one of the world’s largest gold deposits with proven reserves of 370 tonnes.
The system to be installed at Vasilkovsky is specifically designed to automatically assign trucks in order to achieve the best utilization of all mining equipment and maximize production.
read more

Teck Fording River Installs Wenco Software
Teck Coal Ltd has chosen Wenco Software for operations at Fording River located 29km northeast of Elkford, BC. Wenco is installing software on Fording’s fleet consisting of 56 haul trucks and 13 loading units made up of 6 shovels and 7 loaders.
read more

North American Construction Group Selects Wenco for Operations at CNRL
April 2010 – Vancouver B.C. North American Construction Group (NACG) has selected Wenco for operations at Canadian Natural Resources Ltd’s Horizon mine site to remove overburden.
The system designed for NACG includes a contractor integration module to manage the tracking and movement of NACG mining equipment to and from the CNRL fleet on a periodic basis, designed to allow movement of selected equipment under control.
read more
Upcoming Tradeshows
Wenco is excited to announce the 2010 Client Conference and participation at the following upcoming tradeshows:
Wenco will be displaying the latest advances of their Fleet Management software including new features in FleetControl, MineVision, and MDT5; new technologies in BenchManager, as well as the latest in on-board rugged hardware.
read more
|